Field-Core utilizes a work order system which is the driving force of the project.

When previous inspection and equipment data is available the data is loaded into the
work order.
The scope of work is generated for each location (LSD) and the tasks required for
each piece of equipment is identified. The inspector is not able to leave the location
until all tasks have been completed.

When equipment is missing on site or additional equipment is found then the work
order screen will initiate a "pending material transfer".

Verification of non-closed NCR's, CAR's, or other deficiencies are automatically
included in the work order for those specific locations.  The inspectors must validate
the issues while still on site.